Thursday, June 28, 2012

To,
All Clients,
Ionic Realty Ecocity at Virar.

Dear Sir / Madam,

This is to inform you all that the construction work is in progress at the site of Ecocity and the land is free from any encumbrance of any nature.  Also the recent legal proceedings / auction was not in any way connected to the land under construction and the flats sold by Ionic.

All bookings done by the custormers of the company will be delivered to the buyers.

Thanking you,

for Ionic Realty Ecocity

106 comments:

  1. Please keep us posted with all the work activities as this would help us in our future. also when would the registration and the other formalities started.

    ReplyDelete
  2. Dear ionic,

    We are booked 2BHK Flat in ionic. March 2010.
    Dear your project is very long delay we booked flat 27th month before. So dear please give me clear & correct information yar. we are frosted for your project negative points. please please give me clear information.

    ReplyDelete
  3. WHEN will you deliver? THAT is the key question. Please reply WHEN will you deliver?

    ReplyDelete
  4. To,
    All Clients,
    Ionic Realty Ecocity at Virar.

    Dear Sir / Madam,

    "This is to inform you all that the construction work is in progress at the site".............. BUT STILL WE ARE UNABLE TO COMPLETE PILING / FOUNDATION WORK & UNABLE TO START REGISTRATION AS WE EARLIER COMMITTED IT WILL BE IN JULY 2012.


    "of Ecocity and the land is free from any encumbrance of any nature. Also the recent legal proceedings / auction was not in any way connected to the land under construction and the flats sold by Ionic."..................ON THIS BLOCK SO MANY QUESTIONS REGARDING THIS ISSUE BUT NO ANY IONIC SUPERIOR'S ASSURANCE WITH SPECIFIC PROOF TO SOLVE THE QUERY OF THE INVESTORS.

    "All bookings done by the customers of the company will be delivered to the buyers."....................BUT DON'T NO WHEN? YOU WAIT & WATCH THE SHOW TILL NEXT LETTER FROM US.

    Thanking you,

    for Ionic Realty Ecocity..........THANK TO YOU ALSO.

    ReplyDelete
  5. Dear Ionic,

    Please provide proper and accurate information as there is no clear view of the work going on and also there is no updates. i have also read that the work has not yet started. so please provide us all the information at the earliest. with regards to the work and what is going on. please upload some snaps. I have seen few snaps for the month of April which is not at all positive. i have read that few guys had gone to book the flats but as there was no work going on they cancelled it. please provide clear and accurate informaiton at the earliets. this blog is for us as customer and for you as client to provide and pass detailed informaiton as we have invested money in that.

    ReplyDelete
  6. Hi everyone please mention your email id in blog. I will send you images of acknowledgement letter form vvmc & VVMC Receipt. Day of 7th july gone at ionic office all details got from builder. so please ionic investors & buyers please mention in blog you email id.
    Thanx
    Regards
    Tarun

    ReplyDelete
    Replies
    1. Hi Tarun,


      thanks for sharing the information my email address is maximbarboza@gmail.com and also if possible you could send through email some snaps of the construciton work it would be highly appreciated. as it would give us a clear picture of the work going on.

      thanks

      Jonas Barboza

      Delete
    2. Hi Tarun
      Thanks for the information.I have booked a flat also in this project, So please send me this Documents ,My email id is sanjaydutta77@yahoo.com ,It could be give me a big satisfaction.

      Thanks

      Sanjay Dutta

      Delete
    3. please send an e mail on this id - jindalsre@gmail.com

      Delete
    4. Hi Tarun,
      Please share with me also on 23tush@gmail.com

      Delete
  7. This comment has been removed by the author.

    ReplyDelete
  8. Hi Tarun,
    Please share with me also on sushant.chafe@gmail.com

    ReplyDelete
  9. This comment has been removed by the author.

    ReplyDelete
  10. Please share with me also my email id sahu_sushant@yahoo.co.in

    ReplyDelete
  11. Hi Tarun please share with me also jaif1979@gmail.com

    ReplyDelete
  12. Mr.Tarun, please send me the said details on email ID vaibhavsp_mahadik@yahoo.co.in. Thanks for sharing information.

    ReplyDelete
  13. Hi Tarun
    Please send me that Documents , I am waiting for that

    ReplyDelete
  14. hi tarun, please send documents to vikramchauhan@hotmail.com

    ReplyDelete
  15. Hi Traun

    Kindly Send on sachinpad2206@gmail.com

    ReplyDelete
  16. Hi Tarun, pl forward me the details as well my id is
    jacarch@gmail.com

    ReplyDelete
  17. Hi tarun can u please send the.documents on drpraxy17@gmail.com
    thanks for all the work done.

    ReplyDelete
  18. Hey..thanks for the document images..it suggests that they have applied to vvmc and have not procured the required permission..when will they receive the permissions..when will the work start...it definitely looks like a dream project..only we r not sure when this dream would be fulfilled

    ReplyDelete
  19. Hi any one can send me the documents on vinaypanchal@hotmail.com

    ReplyDelete
  20. Hi

    We are inform everyone,

    Builder persion Mr. Harshad sales persion of ionic group they spook this week confirmation latter is coming from builder to you. Builder is letter send to your home.

    But i will meet very soon with vice chairperson, director, MD of ionic group than i will give you feedback.

    Thanx
    Regards
    Tarun mishra

    ReplyDelete
    Replies
    1. Hi Tarun,

      Great Job! let update the things then.... Also let us know which confirmation they are sending?

      Delete
    2. This comment has been removed by the author.

      Delete
  21. Hi any one can send me the documents on ashok.karnam87@gmail.com

    ReplyDelete
  22. yesterday I talked to Mr. Harshad. He told that they r sending the confirmation letter regarding "all the investor will get their flats & they r sorry for delays". He also told that the registration will be by this year end. sharing this information with all of u. thanks.

    ReplyDelete
    Replies
    1. thanx for for your replay. i know letter is coming from builder but i want meet to senior persion of ionic group. i will meet him very soon so please come everyone & decide date when everyone is coming in builder office?

      Delete
  23. I received a letter from Ionic Realty, Saying that the project got delayed due to some problems, Now all things are cleared and the work will pace up soon.....

    ReplyDelete
    Replies
    1. Hi Shobhit, can you send me also the scanned copy of the letter as i am in dubai now an can have a look at it. email address is maximbarboza@gmail.com

      Delete
  24. Hi friends ,
    Can any one share the progress details of the project?
    I also booked 2bhk flat in this project on May 2nd week 2012.

    Any one have acknowledgement letter form vvmc & VVMC Receipt related to this project please share with me on my EmailId: ajaykumar.pal@hotmail.com

    I eagerly waiting for your reply

    ReplyDelete
  25. Hello shobhit can u send me a scan copy of the letter what u got from ionic on my email id hemant905@yahoo.com it's request b'coz i booked the flat before 28the months.

    ReplyDelete
    Replies
    1. Tomorrow, i can send it...because it is at my home....Tomorrow sure.

      Delete
    2. Hi Shobhit, can you send me also the scanned copy of the letter as i am in dubai now an can have a look at it. email address is maximbarboza@gmail.com

      Delete
  26. plz send me also on callmaheshahire@gmail.com


    Very very very slow work on filed...... only 3 Machine working

    ReplyDelete
  27. Hi please send me also my emil id jaif1979@gmail.com

    ReplyDelete
  28. Please send me also since i have not received any such letter.
    sahu_sushant@yahoo.co.in

    ReplyDelete
  29. Guys...Most of you, i have mailed the Ionic's letter...please check.

    ReplyDelete
    Replies
    1. Thanks for mailing the letter.

      Delete
    2. pz send me my mail address is harjinder46@gmail.com

      Delete
  30. Can anybody explain what is the use of this letter. Letter does not even mention the name of the director who has signed it. Also nothing mentioned about project completion schedule. Whatever has been said by builder on blog till date has been but on the letter. Nothing more.

    ReplyDelete
  31. Hello,

    We are inform everyone,

    Meeting with builder after ramjan.

    so please come everyone in meeting & meeting with director of ionic group.

    Thanx
    Regards
    Tarun mishra

    ReplyDelete
    Replies
    1. Hi Tarun

      I also want to Join the Meeting so Pls tell me Date & time when and where the meting will be held .My Mobile no 9867025918 , email -sanjaydutta77@yahoo.com

      Delete
  32. i am planning to book flat in this project. is it advisable
    R. varyani

    ReplyDelete
  33. Hi All,

    I give up, i am ready to sell my 2bhk @2400/- if really interested call me 09323577097

    ReplyDelete
  34. Dear All,

    There was some +ve outcome due to the 1st meeting which was held on 7th july.

    Atleast the builder took the pain to send an apology letter to us, i think some of us have received the letter.

    We are trying to arrange another meeting to make things more clear about the project and due to this the builder will definitely feel some heat.

    We have received reply only from 8 people, we request all to come together to get our work done.

    Ms Pooja spoke to Mr Harshad of Ionic, now he is telling that the meeting can be held on 1st week of september.

    We will inform you of the exact date, as Mr. Tarun(9870008161) is going to speak to Mr.Harshad and will confirm the exact date.

    We request you all to attend the meeting if it is held.

    As we all have invested our hard earned money, and it is every bodies responsbility to work mutually towards getting our work done from the builder.

    If any bodies is outstation due to some reason then please try to send some body from your family to attend the meeting.

    ReplyDelete
  35. Main ye news newpaper main dene ka try kar raha hun... Mostly 22Aug tak ho jaye ga

    ReplyDelete
  36. We want everything tranparent. what ever is the current status of the project we want it to be shared with us by the builder, with exact and correct details, we want to see the work happening on the ground at the project site.
    1.We want to know whether the LAY OUT PLAN is the same as shown to us while booking and if there is any change we want to know the details.
    2.What is the status of all other document approval from government authorities.

    WE WANT THE MEETING MUST BE HELD AS SOON AS POSSIBLE.

    ReplyDelete
  37. Hi Everyone

    Today Mr. Harshad sales persion of ionic group they spook meeting date is fix 1st September 2012

    Ionic director is coming in meeting. Builder hed office at Andheri west shah industrial estate near yes raj studio.

    Please confirm all. This is very important meeting

    R U COMING ?

    Call me on my mobile no 9870008161 & give me your confirmation

    Thanx
    Regards
    Tarun Mishra

    ReplyDelete
  38. Dear All

    Please mention your ALLOTMENT LETTER NUMBER this is required. Mr Harshad informed that the directors are going out of station and they will be back on 29.08.12. So he will be sharing timing for the meeting on 30.08.12 only.

    So please again we are inform bayer & investors please mention you Booking Allotment Letter Number & Booking persion name.

    Thanx
    Regards
    Tarun mishra

    ReplyDelete
  39. Please send details booking allotment letter Number in my email id trnmishra46@gmail.com & Mobile no. 9870008161

    ReplyDelete
  40. meeting 1st sep ko afternoon me 3:00 baje hai ok ionic ke office me
    meeting 1st sep ko afternoon me 3:00 baje hai ok ionic ke office me
    meeting 1st sep ko afternoon me 3:00 baje hai ok ionic ke office me
    meeting 1st sep ko afternoon me 3:00 baje hai ok ionic ke office me

    ReplyDelete
  41. Dear All,

    Meeting is 5:30 P:M evening 1st sep in Ionic Hed office

    Thanx
    Regards
    Tarun mishra

    ReplyDelete
  42. Meeting is at IONIC head office ANDHERI WEST on 01/09/12 at 5.30 pm.CONFIRMED

    ReplyDelete
  43. Dear All

    Meeting is evening 5:30 P.M In Ionic hed office please come everyone directors is coming form daman.

    Send your confirmation & call on my mobile no 9870008161

    Thanx
    Regards

    ReplyDelete
  44. Minutes of the meeting between Ionic Directors Mr Tarique Chunawalla, Mr Azam Khan and Ionic Buyers on 01/09/12 at Ionic andheri west office. :-

    1.Regarding clearances from local authorities, they will wait till 20th Nov for approval if not received they will apply to the Urban Development body of Maharashtra for clearing their Plan, since they claim that their plan is already approved by CIDCO and Urban development department and once it is approved by UD nobody can create hurdle for this project.They claim getting approval from UD will not take much time.
    1a.They have filled an RTI application for obtaining the status of some of their documents which the local authorities are bound to answer withing 19 days.
    2.Once the plan and other papers are approved they claim the possesion will take around 1.5 to 2 years.
    3.Right now Phase 1 will be of 7 floor and they are carrying out the pilling process accordingly, but there may be changes and they may apply for 14 floor plan for phase 1, regarding for rest of the phases they have already prepared a plan of 14 floor but have not applied in the local authorities.
    4.There are changes in the lay out plan which was shown to all buyers while booking, they claim it will be better and not bad and they will make it public once
    it is approved by the government authorities.
    5.They claimed their land title is totally clear and they solely own the land, there is not even 1rs debt only there is some problem due to some documented issues.
    5a.They gave the ref no of highcourt judgement regarding their land which indicates that this land belongs to IONIC.
    Ref no. for the same is 4929 of 2012 and 5329 of 2012 and body can check this in courts website.
    6.They claimed, they will appoint a person who will relevantly answer all queries of their customer in their office.
    7. They will create a portal in their website ionic.in for customer feedback, where customers can post their queries and it will be answered by ionic officials.
    8. They claimed in phase 1 there will be 36 buildings earlier which was 32 buildings.
    9.They claimed, they are totally honest towards the project and they treat their buyers and investors as their family and they will deliver the project.
    10.They claimed there is no financial issue responsible for the project to be delayed.
    11.They claimed,they are doing everything according to the Maharashtra law of ownership act.
    12.Registration will start once the plinth work is done and so the loan tie ups with the banks.
    13.They claim, they have given public notice in newspapers regarding their land title from time to time.

    ReplyDelete
  45. Ionic plz update ur website for latest updates as soon as possible.

    Thanx

    ReplyDelete
  46. 7. They will create a portal in their website ionic.in for customer feedback, where customers can post their queries and it will be answered by ionic officials................. IONIC ECOCITY PORTAL ON WEBSITE ionic.in??????????

    ReplyDelete
  47. What is the status of RTI filed with the local authority as discussed in meeting held on 1st sept.

    ReplyDelete
  48. Dear All,

    Whatever queries you all have please call up IONIC HEAD OFFICE ask for the concerned person who is well aware of tyhe project proceedings, clear your doubts then and their.
    You can also put a mail to contact@ionic.in.

    PLEASE UPDATE IN THE BLOG WHATEVER FEEDACK YOU GET SO THAT EVERY BODY WILL KNOW.

    THANKS.

    ReplyDelete
    Replies
    1. Ionicecocity Investor,

      post on block with names & not with IONICECOCITY INVESTOR. thanks & regards.

      Delete
  49. please let me know the current status of rti

    ReplyDelete
  50. What happen to all no posting on blog after meeting?

    ReplyDelete
  51. HI when you pepole are going for Registrations i ahve booked two flats in your Project so please let me know

    Thanks & Regards
    Sanjeev Rai

    ReplyDelete
  52. Hi this is RAVI Sanjeeva i would like to booked 2bhk flat in your project but can u send me document on my email ravisanjeeva@gmail.com of your project that this project is approved by CIDCO or VVMC and which bank loan are you all doing so that it clear all my doubth and then i can be satisfied to booked in your project and within how many years this project will complete.

    Thanks Regard
    Ravi Sanjeeva

    ReplyDelete
  53. This comment has been removed by the author.

    ReplyDelete
    Replies
    1. Dear Mr. Wasim

      You have written "The Work is Going to Start in Full Swing Very Soon". But this statement you are giving every time but exact month and year you are not informing. If we have received the approval from the VVMC then please send the copy to mail ID: mahendra79in@gmail.com

      regards
      Mahendra Lad

      Delete
  54. Mr. Wasim Shaikh, first introduce yourself & reply with your designation in Ionic Eco City. Thanks.

    ReplyDelete
  55. This is writer the IONIC People always say The Work is Going to Start in Full Swing Very Soon". but they actually don't the actual time . i think this work is not going to start

    ReplyDelete
  56. no any updates regarding project work by ionic people

    ReplyDelete
  57. IONIC has started a Feedback section in their website as Forums for their Investors...
    Kindly each one Reister on it & pls post on the Forums rather than Blogs or Facebook page etc as it has authenticity issues..
    Thanks.

    ReplyDelete
  58. join here for a discussion with ionic: http://ionic.in/forum/ucp.php?mode=register

    ReplyDelete
    Replies
    1. I have registered but I am not able to login.

      Delete
  59. To,
    All Clients,

    We have put revised plan as per VVMC rules and norms as directed by them. We should get the positive reply very soon and permission to bring up the plinth will be given by them.
    Hoping for very early start to everybody’s happiness and satisfaction.

    Thanking you,
    IONIC ECOCITY
    PLANING DEPARTMENT

    ReplyDelete
    Replies
    1. by when do u think you would get the approval and all the legal formalities to be completed.

      please give realistic date.

      Thanks

      Jonas

      Delete
    2. Please give correct picture of the project do not cheat to customer otherwise you all are in trouble.

      Delete
  60. Hope, ki 3-4 saal mein toh permission mil hi jaayegi....Phir 3-4 saal plinth daalne mein lagein....and on and on....

    ReplyDelete
  61. Case Details
    Bench:-Bombay
    Stamp No.:- CAWST/18310/2012 Filing Date:- 09/07/2012 Reg. No.:- CAW/2380/2012 Reg. Date:- 13/09/2012
    Main Matter
    Stamp No.:- WPST/15968/2012 Reg No.:- WP/5329/2012
    Petitioner:- Respondent:-
    Petn.Adv.:-
    District:- MUMBAI
    Bench:- DIVISION
    Status:- Pre-Admission Category:- INJUCTION
    Next Date:- 13/12/2012 Stage:- FOR ORDERS [CIVIL SIDE MATTERS]
    Coram:- HON'BLE SHRI JUSTICE S.J. VAZIFDAR
    HON'BLE SHRI JUSTICE R.D. DHANUKA
    Last Date:- 25/09/2012 Stage:- FOR ADMISSION - FRESH [CIVIL SIDE MATTERS]
    Last Coram:- HON'BLE SHRI JUSTICE A.M. KHANWILKAR
    HON'BLE SMT. JUSTICE V.K. TAHILRAMANI

    ReplyDelete
  62. WHat the hell are going , when we get the our dream home after 20 years

    I am really very disappointed with this project

    ReplyDelete
  63. Ionic please whatevere you have updates please share with us

    who has put all my money , other wise will have to take the action

    ReplyDelete
  64. There is Problem With This Link
    http://ionic.in/forum/ucp.php?mode=register

    ReplyDelete
  65. Mr Mahendra what is That Case Details
    Bench:-Bombay
    Stamp No.:- CAWST/18310/2012 Filing Date:- 09/07/2012 Reg. No.:- CAW/2380/2012 Reg. Date:- 13/09/2012

    ReplyDelete
  66. can you please keep the updates what is the current status of all case details

    ReplyDelete
  67. The management has seen the Blogs put up by various persons, most of these blogs seems to have been posted with total misunderstanding of the project.

    We request our esteemed customers not to panic. The final plan with liberty to amend is ready to be submitted as per the directions and in compliance with all the formalities of VVMC.

    The piling work is almost completed on some part of the property. We have genuine reason for delay in taking the work forward. As you all know that VVMC has been recently constituted in this area. They have not adopted DC rules as yet. They have also do not have adequate staff in their building proposal department.

    They still depend on staff of CIDCO for planning of Township and large layouts. The earlier amended plan was submitted by us to VVMC on 24/05/2012. VVMC replied on 20/06/2012 which was received by us on 23/10/2012 asking for certain documents which were not in their records from the old CIDCO files.

    Management has submitted the required documents and will be submitting the provisional plans before 22nd December 2012.

    We would like to inform our esteemed customers that certain temporary staff members failed to communicate with our customers on a regular basis.

    The management has now replaced the staff, so that all progress will now be informed through our website from time to time.

    We assure our esteemed customers that they will see good progress at the site in a short time

    ReplyDelete
  68. This is to inform our esteemed customers that as per our commitment, we have submitted the plans with the liberty to amend the same in VVMC on 10/12/2012 at 2.00 pm. We had committed to submit the same on or before 22nd December 2012. But we submitted the same today i.e. on 10/12/2012, 12 days prior to the committed date and 22 days before the deadline. After scrutiny of the plans and relevant document by the officers of the VVMC, we will follow-up through our architect to get sanction of the amendment as soon as possible and will inform you the progress from time to time. Our esteemed customers can inspect the copy of submitted amendment plan at our office between 3 to 6 pm at any working day (team Ionic Communication).

    ReplyDelete
    Replies
    1. Due to this change plan we have selected the building location, flat selection get change or remain same. If possible pls attached the new layout or plan to this site.

      Delete
  69. Dear Ionic Team Management.
    Thank you for your response and also for updating us with the information. Now as you have mentioned that you have submitted the documents to VVMC and waiting for the reply. could you please let us know by when the reply would be send to you and please keep us updated with the same.
    Also wanted to ask from you after this approval is there anything pending from Ionic to be submitted for approval or we can consider after this approval the work will be started full fledged. if any other approval is still pending please let us know what it is all about and the time taken.
    Please let us know the expected month when would you get all the related documents to start the work properly with all the documents in hand.
    Dear ionic, what we are asking is proper information and guidance with regards to the project. I hope you understand our frustrations and restlessnss with regards to the project as we are being only shown dreams and false promises. we where told that by December all approvals and everything would be completed and work would be started.
    Please let us know the facts and provide us correct information. this blog is to get in touch with you to understand any challenges and difficulties in the work.
    It is totally understandable that work might be slow or delayed due to controllable and un controllable reasons we are asking from you the correct picture.
    if possible let us have a healthy discussion and clear picture as we have invested our money in this.

    also please upload some snaps of the work progress.

    Thanks

    Jonas Barboza

    ReplyDelete
  70. It means, ki 3.5 saal aur lagenge....1 saal toh permission aane mein(agar aayi toh) phir 7 maaley ki permission milne ke baad doobaara 14 maaley ki permission lene ke liye....aur 2.5 saal building banaane mein....Pataa nahi ye TAJMAHAL kab banega. "Mughal-E-Azam" bhi 10 saal mein bani thhi, ye toh 3 saal mein neenv hi nahi khod paaye....Totally frustated....Dead project.

    ReplyDelete
  71. Dear Ionic Management,

    Thank you for update, however it is very less information from your side in compare to required information regarding update & progress of this project but still it shows that you people have some feeling for your customers.

    We will be very happy if you give your information point-wise instead of unclear information. As a customer we required only below information (and not your procedure details to taking permission and all, as we are looking for one home and not interested in real estate business & procedure.):

    1. Advice expected date of completion of all your approval work.
    2. Advice expected date of starting of project construction work in full-fledged. Current works going on at site are just "NIL".
    3. Advice expected date of agreement of the flat.
    4. Advice expected date of completion of 1st phase of the project.

    Above dates only we required from your side with your commitment to fulfill the same.

    No need to say again that we are frustrated with this project as every-one crying for this and you are doing your work "Just Ignoring".

    At least expecting your feedback on this with asked date information.

    Regards,
    Rajan

    ReplyDelete
  72. After depositing lac of rupees now we have to look after the activities from builder side like whether he got the approval? whether he finish the piling work? whether he brought the material? whether he is linked with dream project or not?.............we have better opportunity to start real estate business by having great experience from ionic group. this year also gone in waiting and watching. God knows that the project will be on earth or on colour papers only.

    ReplyDelete
  73. Dear Ionic Management,
    Kindly provide the dates as Rajan Mentioned

    1. Advice expected date of completion of all your approval work.
    2. Advice expected date of starting of project construction work in full-fledged. Current works going on at site are just "NIL".
    3. Advice expected date of agreement of the flat.
    4. Advice expected date of completion of 1st phase of the project.

    ReplyDelete
  74. Current rate is 3800 PSF, as stated by builder. I have 2BHK flat with me , I would like to sell it on 2800 PSF. I had booked on 2700 PSF one year ago. If anyone interested then please let me know.

    ReplyDelete
    Replies
    1. I am interseted in purchase of 2BHK @ 2700 PSF you can contact me at Vijay - 8879433437

      Delete
    2. Can you please call me Manish if the offer you have made is still open. Please call on 9924181993

      Delete
  75. Hi to all,
    Work has been started, and i got the pictures of site, if anybody wants the pictures, then send me email at
    sohirealty@gmail.com, or sms me 9702289773,
    Work is in full swing now.
    And soon i will provide u with new layout also.
    Regards,
    Sohi Group

    ReplyDelete
  76. Dear Ionic,

    any updates on the project. please let us know it has been more than 1 month as there is no information and updates from your end.

    Thanks

    Jonas

    ReplyDelete
  77. Anybody seen the ads for this proect on 22 feb in mid day as affordable homes in virar they does not show the project as a big project and it was ads from their channel partners from virar office not direct from buider

    ReplyDelete
  78. Dear Ionic,

    If you do not have anthing to say just either close the blog or mention that work is not started. but please understand one thing that we are asking you simple questions and there is no reply from your end. after january 21 there is no response from your end. you had mentioned work is started, if started than show some photos or update us with the information. this is absolutely bad and un professional from your end. please update us what is the situation of the project, is the work started ? have you received all the required clearance from all the parties. it is simple you just have to answer and let us know.

    Thanks
    Jonas

    ReplyDelete
  79. Wow!! No answers or replies to Jonas query!?

    Well I was planning to buy 1BHK at Ionic, guys please need your honest advice. I understand there has been a delay, but what is the current status...

    ReplyDelete
  80. Dear Ionic Management,
    I have given a request for registration on your forum In your Web-side

    If you are not interested to give us any reply then why you are telling us to register on Forum for The inquiry with the Allotment no.

    ON last meeting Management has given us lot of commitment but single on commitment dose not done from your end

    ReplyDelete
  81. my Self Bharat, i was booked a flat in Eco ionic city on dec.2011, in 12 building. what are the present status. please helf

    ReplyDelete
  82. Hello ionic investors,
    iam also one of the victims of Azam khan project namely fountain square oshiwara. work not started since 5-7 years. what is is the status of ionic ecocity. has anybody went to courts

    ReplyDelete